After backfilling the holes dug for our columns we now enter the beams and slab stage. The ground was leveled and concrete blinding poured in preparation for steelfixing for the beams. After steel is fixed shattering was done and ready to recieve concrete. 3/4 of the beams is now complete. More shattering is underway in preps for concrete then we move to the slab level.